[Mayan calendar]

Poor Weather Queue Summary : Semester 2013B GS

The queues shown in the tables below summarise the programs that constitute the "Poor Weather Queue" on GS. The Poor Weather Queue is a pilot program introduced in 2006B to fill telescope time under very poor, but usable, conditions. These programs are distinct from other queue programs in three important ways: 1) time spent on poor weather programs will not be charged to the PIs or the partner countries; 2) poor weather programs can exist in queue only, and must meet the observing condition constraints shown below; and 3) poor weather programs are lower priority than the "regular" queue (bands 1 to 3) and have no explicit or implicit guarantee of being observed. They will be executed only when nothing in the regular queue is observable.

In all other respects — NGO and Gemini contact scientist support, Phase II definitions, Gemini Science Archive data distribution — programs in the Poor Weather Queue are similar to all other Gemini queue programs. In the Observing Tool, poor weather queue programs are designated as Band 4, to distinguish them from the rest of the queue.

Observing condition constraints for poor weather programs must meet one of the following:

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2013B-Q-88 Ahumada AR A new template spectral library of Large Magellanic Cloud's star clusters GMOS-S 20.00
Execution Status: Dates Taken:
20130921 20130922 20131008 20131009 20131107 20131109 20131125 20131126 20140427 20140430 20140623 20140711 20140712 20140713 20140714 20140715 20140717 20140721 20140918 20140929 20141025 20141027
Completion Status:
100%
GS-2013B-Q-89 Beers BR Missing metal-poor stars from the HK and Hamburg/ESO Surveys (South) GMOS-S 25.00
Execution Status: Dates Taken:
20131008 20140110 20140118
Completion Status:
11%
GS-2013B-Q-90 Sales US The Gas kinematics and Optical Classification of OH Megamaser Galaxies GMOS-S 20.00
Execution Status: Dates Taken:
20130805 20130806 20130810 20130812 20130902 20130920 20130921 20130922 20140101 20140102 20140110 20140227 20140306 20140314 20140315 20140406 20140420 20140623 20140624 20140701 20140721 20141119
Completion Status:
100%
GS-2013B-Q-91 Britt US NIR Spectrum of new Candidate FU Orionis Star Flamingos2 0.50
Execution Status: complete Dates Taken:
20131023 20131025 20140314
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 12:23:18 GMT