[Mayan calendar]

Large Program Queue Summary : Semester 2016B GS

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GS.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2016B-LP-1 Balogh LP The GOGREEN Survey of dense galaxy environments at 1<z<1.5 GMOS-S 50.70
Execution Status: Dates Taken:
20160724 20160725 20160928 20161018 20161024 20161025 20161026 20161027 20161028 20161029 20161030 20161103 20161206 20170114 20170118 20170126 20170127 20170131 20170201 20170202 20170227 20170305
Completion Status:
62%
GS-2016B-LP-2 Fritz LP Probing the dark halo of the Milky Way with GeMS/GSAOI GSAOI+GeMS Adaptive Optics 27.40
Execution Status: Dates Taken:
20161107 20161109 20161114 20170113 20170114 20170115 20170116 20170316
Completion Status:
48%
GS-2016B-LP-3 Masiero LP Followup of newly discoverd Near-Earth objects from the NEOWISE survey GMOS-S 8.00
Execution Status: complete / SToO Dates Taken:
20160724 20160803 20160901 20160928 20161002 20161022 20161023 20161025 20161116 20161130 20161228
Completion Status:
100%
GS-2016B-LP-11 Hsieh LP Observational Characterization of Active Main-Belt Comets and Main-Belt Comet Nuclei (South) GMOS-S 3.10
Execution Status: complete Dates Taken:
20161003 20161008 20161105 20161128 20161203
Completion Status:
100%
GS Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2016B-LP-5 Buckley-Geer LP Spectroscopic Confirmation and AO imaging Follow-Up of Dark Energy Survey Strong Lensing Systems and Spectra for Photometric Redshift Calibration GMOS-S 80.00
Execution Status: Dates Taken:
20161129 20161201 20161202 20161203 20161205 20161208 20161225 20161227 20161230 20170131 20170216 20170218 20170304 20170305
Completion Status:
30%
GS-2016B-LP-6 Chen LP Characterizing Dusty Debris in Exoplanetary Systems GPI 14.80
Execution Status: Dates Taken:
20161020 20161021 20161219 20161220 20161221
Completion Status:
67%
GS-2016B-LP-10 Foley LP DES Supernova Cosmology (South) GMOS-S 5.00
Execution Status: complete / SToO Dates Taken:
20160907 20160909 20160910
Completion Status:
100%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 12:42:09 GMT