The table below summarizes the Gemini North queue programs and their execution status. This page is updated once per day.

The columns in the table are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Participant (AR, BR, CA, CL, KR, UH, US) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Semesters shown in square brackets e.g. [21B] indicate that the program can be carried over to the specified semester.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2020B-LP-102 Venn LP Chemistry of new metal-poor stars found in the Pristine Survey GMOS 20.00
Execution Status: Dates Taken:
20200922 20200923 20200925 20200926 20200928 20201010 20201222 20210106
Completion Status:
99%
GN-2020B-LP-104 Hsieh LP Observational Characterization of Recurrently Active Main-Belt Comets and Near-Earth Main-Belt Comet Candidates GMOS 4.70
Execution Status: Dates Taken:
20200801 20200813 20200817 20200908 20200910 20201014 20201224 20210103 20210116 20210118
Completion Status:
68%
GN-2020B-LP-105 Howell LP Validation and Characterization of Exoplanets with Gemini HIgh-Resolution Imaging Visitor 33.70
Execution Status: complete Dates Taken:
20200804 20200807 20200809 20200810 20200917 20201202 20201203 20201204 20201205 20201206 20201207
Completion Status:
100%
GN-2020B-LP-106 Turner LP Exploring the Diversity of Exoplanet Atmospheres at High Spectral Resolution GMOS 41.60
Execution Status: Dates Taken:
20200927 20201006 20201008 20201011 20201223 20210105 20210107
Completion Status:
59%
GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2020B-LP-16 Shemmer LP Placing High-Redshift Quasars in Perspective: a Gemini Near-Infrared Spectroscopic Survey GNIRS 28.00
Execution Status: complete Dates Taken:
20200819 20200821 20200822 20200823 20200830 20200901 20200908 20200909 20200911 20200929 20200930 20201001 20201003 20201005 20201006 20201127 20201128 20201129 20201130 20201209 20201211 20201212 20201221 20201225 20201231 20210101 20210102
Completion Status:
100%
GN-2020B-LP-201 Trafton LP Monitoring Seasonal Reversal in Uranus' Upper Atmosphere GNIRS 7.30
Execution Status: complete Dates Taken:
20200902 20200908 20200909 20201007 20201015 20201210 20210103
Completion Status:
100%
GN-2020B-LP-205 Howell LP Validation and Characterization of Exoplanets with Gemini HIgh-Resolution Imaging Visitor 6.30
Execution Status: complete Dates Taken:
20200810 20201202 20201203
Completion Status:
100%