[Mayan calendar]

Poor Weather Queue Summary : Semester 2013A GN

The queues shown in the tables below summarise the programs that constitute the "Poor Weather Queue" on GN. The Poor Weather Queue is a pilot program introduced in 2006B to fill telescope time under very poor, but usable, conditions. These programs are distinct from other queue programs in three important ways: 1) time spent on poor weather programs will not be charged to the PIs or the partner countries; 2) poor weather programs can exist in queue only, and must meet the observing condition constraints shown below; and 3) poor weather programs are lower priority than the "regular" queue (bands 1 to 3) and have no explicit or implicit guarantee of being observed. They will be executed only when nothing in the regular queue is observable.

In all other respects — NGO and Gemini contact scientist support, Phase II definitions, Gemini Science Archive data distribution — programs in the Poor Weather Queue are similar to all other Gemini queue programs. In the Observing Tool, poor weather queue programs are designated as Band 4, to distinguish them from the rest of the queue.

Observing condition constraints for poor weather programs must meet one of the following:

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2013A-Q-113 Beers BR/US Missing metal-poor stars from the HK and Hamburg/ESO Surveys (North) GMOS 54.55
Execution Status: Dates Taken:
20130515 20130525 20130527 20130609 20130610
Completion Status:
18%
GN-2013A-Q-114 Geballe GS Additional Probes of the Galactic Center's Interstellar Medium - continuation GNIRS 40.00
Execution Status: Dates Taken:
20130306 20130308 20130311 20130322 20130323 20130329 20130415 20130416 20130428 20130518 20130525 20130608 20130609 20130610 20130611 20130612 20130614 20130618 20130622 20130623 20130628 20130630 20130709 20130807 20130814 20130818 20130819 20130820 20130822
Completion Status:
52%
GN-2013A-Q-115 Margheim GS A Poor Weather View on the Transient Universe GMOS 10.00
Execution Status: SToO Dates Taken:
20130315 20130324 20130326 20130415 20130525 20130603 20130604 20130609 20130623 20130721
Completion Status:
91%
GN-2013A-Q-116 Limoges CA A spectroscopic binary white dwarf candidate in SUPERBLINK GMOS 2.20
Execution Status: complete Dates Taken:
20130415
Completion Status:
100%
GN-2013A-Q-117 Sales US The Gas kinematics and Optical Classification of OH Megamaser Galaxies GMOS 10.70
Execution Status: complete Dates Taken:
20130604 20130616 20130618 20130623 20130721 20130724 20130825 20131201 20131202 20131206 20131210 20131213 20131214 20131217
Completion Status:
100%
GN-2013A-Q-118 Gagne CA Spectroscopic confirmation of candidate young low-mass stars and brown dwarfs in young moving groups GNIRS 10.00
Execution Status: Dates Taken:
20130517 20130518 20130527 20130528
Completion Status:
20%
GN-2013A-Q-119 Trujillo GS Recovery of Bright Kuiper Belt Objects GMOS / GMOS-S 5.00
Execution Status: Dates Taken:
20130510 20131206
Completion Status:
17%
GN-2013A-Q-120 Mason GS Supporting observations for the Palomar XD survey GNIRS / NIFS 1.50
Execution Status: complete Dates Taken:
20130711 20130807 20130820
Completion Status:
100%
GN-2013A-Q-121 van Dokkum US Spectroscopy of ultra faint galaxies in the M101 field GMOS 3.00
Execution Status: Dates Taken:
Completion Status:
0%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:21:48 GMT