Poor Weather Queue Summary : Semester 2010A GS

The queues shown in the tables below summarise the programs that constitute the "Poor Weather Queue" on GS. The Poor Weather Queue is a pilot program introduced in 2006B to fill telescope time under very poor, but usable, conditions. These programs are distinct from other queue programs in three important ways: 1) time spent on poor weather programs will not be charged to the PIs or the partner countries; 2) poor weather programs can exist in queue only, and must meet the observing condition constraints shown below; and 3) poor weather programs are lower priority than the "regular" queue (bands 1 to 3) and have no explicit or implicit guarantee of being observed. They will be executed only when nothing in the regular queue is observable.

In all other respects — NGO and Gemini contact scientist support, Phase II definitions, Gemini Science Archive data distribution — programs in the Poor Weather Queue are similar to all other Gemini queue programs. In the Observing Tool, poor weather queue programs are designated as Band 4, to distinguish them from the rest of the queue.

Observing condition constraints for poor weather programs must meet one of the following:

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Poor Weather Queue
Ref # PI Partner Title Instrument Hours
allocated
GS-2010A-Q-75 Yong US Fluorine abundances in thin and thick disk stars Phoenix 8.00
Execution Status: complete Dates Taken:
20100130 20100204 20100206 20100302 20100303 20100304 20100307 20100330 20100412 20100629
Completion Status:
100%
GS-2010A-Q-76 Winge GS Identifying star formation and nuclear activity in interacting galaxies GMOS-S 35.00
Execution Status: complete Dates Taken:
20100114 20100319 20100321 20100323 20100324 20100522 20100524 20100609 20100618 20100626 20100629 20100630 20100713 20100715 20100716 20100722 20100801 20100802 20100803 20100804 20100805 20100807 20100808 20100809 20100810 20100815 20100817 20100822 20100901
Completion Status:
100%
GS-2010A-Q-77 Raychaudhury UK Spectroscopy of globular clusters of NGC 5044: evolution and dynamics GMOS-S 23.00
Execution Status: Dates Taken:
20100226
Completion Status:
0%
GS-2010A-Q-78 Beers US A Survey for Unrecognized Carbon-Enhanced Metal-Poor Stars in the Galaxy GMOS-S 25.00
Execution Status: complete Dates Taken:
20100330 20100401 20100404 20100405 20100407 20100412 20100414 20100415 20100416 20100417 20100418 20100419 20100420 20100421 20100424 20100425 20100602 20100603
Completion Status:
100%
GS-2010A-Q-79 Hinkle US Orbital Survey of Red Giant - White Dwarf SNe Ia Progenitors Phoenix 25.00
Execution Status: complete Dates Taken:
20100312 20100313 20100314 20100315 20100323 20100330 20100404 20100424 20100425 20100426 20100522 20100524 20100526 20100528 20100602 20100603 20100604 20100609 20100626 20100627
Completion Status:
100%
GS-2010A-Q-80 Artigau CA Parallax distance to an overlooked late-T dwarf within 5pc of the Sun GMOS-S 4.50
Execution Status: complete Dates Taken:
20101030 20101204 20101212 20101215 20110412 20110414
Completion Status:
100%
GS-2010A-Q-81 Schimoia BR Broad double-peaked Halpha profiles from NGC1097 and NGC7213 GMOS-S 3.00
Execution Status: complete Dates Taken:
20100810 20100811 20100815 20100818
Completion Status:
100%
GS-2010A-Q-82 Dieterich US Probing Stellar Physics at the Bottom of the Main Sequence: Refining Spectral Types at the Stellar / Substellar Transition GMOS-S 52.00
Execution Status: complete Dates Taken:
20100626 20100627 20100705 20100715 20101113 20101217 20101230 20110102 20110111 20110208 20110209 20110210 20110423 20110513 20110525 20110526 20110527 20110528 20110530 20110531 20110601 20110602 20110603 20110604 20110627 20110701 20110705 20110724
Completion Status:
100%

 