[Mayan calendar]

Large Program Queue Summary : Semester 2016B GN

The queues shown in the tables below summarise the programs that constitute the "Large Program Queue" on GN.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.


The columns in the table for Gemini North are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program).
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2016B-LP-1 Fraser LP COL-OSSOS: COLours for the Outer Solar System Object Survey GMOS / NIRI 50.00
Execution Status: Dates Taken:
20161026 20161027 20161029 20161030 20161102 20161103 20161104
Completion Status:
43%
GN-2016B-LP-6 Huitson LP The First Survey Dedicated to the Detection and Characterization of Clouds in Exoplanet Atmospheres GMOS 23.80
Execution Status: complete Dates Taken:
20160721 20160727 20160728 20160906 20160909 20160913 20161116 20161222 20170102
Completion Status:
100%
GN-2016B-LP-8 Walsh LP Addressing a Bias in the Relation Between Galaxies and Their Central Black Holes NIFS+Altair / NIFS+AltairLGS 37.50
Execution Status: Dates Taken:
20160914 20160917 20160918 20160919 20160920 20160921 20160925 20160928
Completion Status:
95%
GN-2016B-LP-11 Hsieh LP Observational Characterization of Active Main-Belt Comets and Main-Belt Comet Nuclei (North) GMOS 11.20
Execution Status: Dates Taken:
20160806 20160810 20160905 20160927 20161022 20161025 20161129 20161222 20161229 20170104 20170109 20170110 20170115 20170118 20170120 20170126 20170127 20170130 20170131
Completion Status:
87%
GN Large Program Queue
Ref # PI Partner Title Instrument Hours
allocated
GN-2016B-LP-5 Crossfield LP Validating K2’s Habitable and Rocky Planets with AO Imaging NIRI+Altair / NIRI+AltairLGS 10.00
Execution Status: Dates Taken:
20160625 20160712 20160714 20160715 20160717 20161019 20170112
Completion Status:
73%
GN-2016B-LP-7 Shen LP A GNIRS Near-IR Spectroscopic Survey of z>5.7 Quasars GNIRS 49.40
Execution Status: Dates Taken:
20160719 20160720 20160729 20160804 20161012 20161013 20161014 20161019 20161021 20161102 20161105 20161109 20161110 20161111 20161113 20161114 20161116 20170110 20170113 20170114 20170115 20170120
Completion Status:
89%
GN-2016B-LP-10 Foley LP DES Supernova Cosmology (North) GMOS 49.50
Execution Status: SToO Dates Taken:
20160906 20160927 20161012 20161013 20161029 20161030 20161105 20161109 20161128 20161129 20161222 20161223 20170104 20170121 20170123
Completion Status:
61%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 17:42:37 GMT