[Mayan calendar]

Queue Summary : Semester 2007A GS

The queues shown in the tables below summarise the programs that have been awarded time on GS. Jump directly to the queue for:

The queue is constructed by the International TAC from the ranked list of proposals of each National TAC using the merging sequence and is divided into three scientific ranking bands (SRBs). Joint proposals (submitted to more than one NTAC for joint support) were combined by the ITAC, are shown in the table as a single entry and are executed as such. Several proposals have multiple occurrences as they were sub-divided by the relevant NTAC; each component is executed separately.

Within each band, all proposals are assumed to have equal scientific merit and have been sorted by PI name for convenience. The choice of which observation within which program to execute next depends on the match to current observing conditions, the balance of each partner's usage and other factors such as future accessibility, whether a program has been started etc. (see a detailed discussion in Puxley 1997; Gemini Preprint #19). The aim is to exhaust band 1 (highest ranked) programs before moving onto band 2 and so on. An observation in band 1 that does not require the best conditions will nevertheless be executed in preference to a band 2 observation even if the latter is a better match. Thus the likelihood of execution decreases from band 1 through to band 3. Bands 1 through 3 aim to fill the nominal queue time available (excluding weather loss). Hence programs in band 3 overfill the queue and provide flexibility with respect to weather conditions and foreseen or unforeseen problems.

This report is generated daily (see the bottom of the page for the current timestamp). The pages linked via Completion Status are updated approximately every 4 hours. Note that the completion fraction may change as the time accounting is adjusted during the quality assessment process.

Note that individual SRBs will not be in detailed balance with respect to partner shares. Aggregating over two or more bands generally provides an equitable distribution of queue loading (in hours, not in the number of proposals) once any classically-scheduled programs are taken into account. Additional flexibility is available when executing observations to balance the partner usage of time. The intent is to achieve balance over 2 or 3 semesters, not a single semester.


The columns in the table for Gemini South are:
Ref # Gemini reference number (note that this is different from any internal National TAC reference number). Click on it to see the proposal abstract (when available).
PI Name of Principal Investigator. (If a joint proposal, the name of the primary contact for the entire program is listed).
Partner Partner (UH = University of Hawaii, GS=Gemini staff) or country (US, UK, CA, CL, AU, AR, BR) to which time will be charged. If a joint proposal, all contributors are shown.
Title The title of the science program.
Instrument Name of the instrument(s) required.
Hours Allocated Time allocated to the program (if a joint proposal, this is the total time for the program). Programs identified e.g. [r06A] were assigned rollover status by the ITAC and will be carried over into the specified semester if not completed in this semester. Programs carried forward from previous semester(s) are linked at the top of this page.
Execution Status Click on this hyperlink to see the current status of each observation in the program.
Data Taken The UT date(s) on which data were taken.
Completion Status This shows an estimate of the fraction of allocated time that has been used. Note that this is a preliminary estimate and is only an indication of the completion state of the program. The completion state may not reflect the formal time accounting. Also note that some programs may be completed in less than the allocated time (e.g. if conditions were better than requested or if the request was overestimated).

The assigned support staff (Gemini Contact Scientists and National Office staff) for each Gemini North ODB and Gemini South ODB program are listed in the interactive 'snapshots' of the Observing Database (ODB).

GS Scientific Ranking Band 1
Ref # PI Partner Title Instrument Hours
allocated
GS-2007A-DD-2 Michaud DD The Gemini South legacy images program: PR images for 2007A GMOS-S 6.85
Execution Status: Dates Taken:
20070318 20070320 20070712 20070718 20070719
Completion Status:
70%
GS-2007A-DD-3 Gezari DD Constraining the MIR emssion of SagittariusA* within a coordinated multi-wavelength campaign TReCS 9.00
Execution Status: complete Dates Taken:
20070523 20070524 20070525 20070526
Completion Status:
100%
GS-2007A-DD-10 Wang DD Optical colour of the anomalous X-ray pulsar 1E 1048.1-5937: a second case for magnetars GMOS-S 3.00
Execution Status: complete Dates Taken:
20070624 20070715 20070716
Completion Status:
100%
GS-2007A-DD-11 Davidson DD An Unexpected Event in Eta Carinae GMOS-S 2.50
Execution Status: complete Dates Taken:
20070610 20070612 20070616 20070617 20070618 20070630 20070710 20070711
Completion Status:
100%
GS-2007A-DD-12 Asplund DD Constraining the Formation of the Galactic Bulge Phoenix 15.00
Execution Status: complete Dates Taken:
20070626 20070627 20070628 20070629
Completion Status:
100%
GS-2007A-DD-16 De Buizer DD Exploring the relation between Class II methanol masers, disks, and outflows in high-mass star forming regions using infrared interferometry - Gemini support TReCS 0.50
Execution Status: complete Dates Taken:
20070630 20070701
Completion Status:
100%
GS-2007A-DD-99 Miller QPT Timing Constraint Tests GMOS-S 0.00
Execution Status: Dates Taken:
Completion Status:
NaN%
GS-2007A-Q-1 Albert CA Spectroscopic Investigation of Exceptionnally Cool Brown Dwarf Candidates from the CFHT Legacy Survey GNIRS / NIRI 17.00 [r08A]
Execution Status: complete / rollover Dates Taken:
20070310 20070312 20070320 20070325 20070326 20070331 20070401 20070404
Completion Status:
100%
GS-2007A-Q-2 Bersier UK The Supernovae of Gamma-Ray Bursts: Exploring the diversity of stellar explosions GMOS-S 5.00 [r08A]
Execution Status: rollover / SToO Dates Taken:
20070722 20070723 20070804
Completion Status:
27%
GS-2007A-Q-3 Chen CA/CL/UK/US Rapid Spectroscopy and Imaging Follow-up of gamma-Ray Burst Afterglows on the Gemini Telescopes GMOS-S / GNIRS 15.00
Execution Status: RToO Dates Taken:
20070213 20070225 20070319 20070407 20070408 20070429 20070501 20070515 20070518 20070622 20070630 20070709 20070725
Completion Status:
100%
GS-2007A-Q-4 Clayton US What Fraction of Type II Supernovae Produce Dust and Why? GMOS-S 10.50
Execution Status: complete Dates Taken:
20070212 20070219 20070220 20070227 20070318 20070511 20070512 20070704 20070705 20070711
Completion Status:
100%
GS-2007A-Q-5 Ellis AU An extreme mass-to-light ratio cluster GMOS-S 8.50 [r08A]
Execution Status: complete / rollover Dates Taken:
20070306 20070308 20070314 20070315 20070318 20070319 20070320 20070321
Completion Status:
100%
GS-2007A-Q-6 Fox AU/CA/GS Environs and Explosion Physics of Short-Hard Gamma-Ray Bursts GMOS-S / GNIRS 11.00
Execution Status: RToO Dates Taken:
Completion Status:
0%
GS-2007A-Q-7 Gomez AR Star Formation in Southern Infrared Small Dark Clouds TReCS 5.40
Execution Status: complete Dates Taken:
20070210 20070211 20070212 20070213 20070403 20070404 20070407 20070429
Completion Status:
100%
GS-2007A-Q-8 Heinke US Simultaneous X-ray and Optical Study of an Accreting Millisecond Pulsar in Quiescence GMOS-S 3.50 [r08A]
Execution Status: complete / rollover Dates Taken:
20070308 20070310
Completion Status:
100%
GS-2007A-Q-9 Infante CL Spectroscopy of z>7 Galaxy Candidates in the Fields of Lensed Clusters GNIRS 24.00
Execution Status: Dates Taken:
20070324 20070325 20070326 20070407 20070409
Completion Status:
45%
GS-2007A-Q-10 Kirshner US The Reverse Shock in SN 1987A GMOS-S 2.00 [r08A]
Execution Status: complete / rollover Dates Taken:
20070219 20070322 20070323 20070325 20070326
Completion Status:
100%
GS-2007A-Q-11 Lipari AR Deep GMOS IFU Spectroscopy of Sub-mm and Radio BAL-QSOs (at high Z) GMOS-S 3.60
Execution Status: complete Dates Taken:
20070213 20070214 20070215 20070216 20070218 20070219 20070224 20070225
Completion Status:
100%
GS-2007A-Q-12 Lodieu UK Near-infrared spectroscopy of new low-mass brown dwarfs in the Upper Sco cluster GNIRS 19.70 [r08A]
Execution Status: complete / rollover Dates Taken:
20070309 20070321 20070324 20070326 20070331 20070401 20070402 20070403 20070404 20070406 20070407
Completion Status:
100%
GS-2007A-Q-13 Moises BR The Stellar Content of the Giant HII Region G274.0-1.1 GNIRS 4.40 [r08A]
Execution Status: complete / rollover Dates Taken:
20070309 20070321
Completion Status:
100%
GS-2007A-Q-14 Peterson AU A spectroscopic study of a z=9 galaxy lensed by a z=6.5 QSO GMOS-S / GNIRS 8.00 [r08A]
Execution Status: complete / rollover Dates Taken:
20070214 20070218 20070219 20070220 20070309 20070318
Completion Status:
100%
GS-2007A-Q-15 Pinfield UK Confirming the first Y dwarfs from UKIDSS GNIRS 9.50 [r08A]
Execution Status: rollover / SToO Dates Taken:
20070310 20070312 20070404
Completion Status:
23%
GS-2007A-Q-16 Plana BR Massive-star formation on the borders of the Galactic HII Region RCW82 TReCS 4.30 [r08A]
Execution Status: complete / rollover Dates Taken:
20070428 20070429
Completion Status:
100%
GS-2007A-Q-17 Rothberg US Dynamics of Merger Remnants in the Infrared GNIRS 16.00 [r08A]
Execution Status: rollover Dates Taken:
20070209 20070210 20070211 20070213 20070308 20070309 20070326 20070327 20070330 20070401
Completion Status:
71%
GS-2007A-Q-18 Smith US IR Variability of Eta Carinae TReCS 6.00 [r08A]
Execution Status: complete / rollover Dates Taken:
20070429 20070515 20070524
Completion Status:
100%
GS-2007A-Q-19 Smith US IR Variability of Eta Carinae GNIRS 3.00 [r08A]
Execution Status: complete / rollover Dates Taken:
20070319
Completion Status:
100%
GS-2007A-Q-20 Soderberg US The Relation of Type Ib and Ic Supernovae Revealed with NIR Spectroscopy GNIRS 3.80 [r08A]
Execution Status: rollover / SToO Dates Taken:
20070210 20070216 20070308 20070309 20070310 20070312 20070404
Completion Status:
73%
GS-2007A-Q-21 Stassun US Visible-light light curves of the first brown-dwarf eclipsing binary GMOS-S 10.00 [r08A]
Execution Status: complete / rollover Dates Taken:
20070215 20071004 20071010 20071016 20071102 20071103 20071121 20071203 20071209 20071215 20080208 20080211 20080212 20080213 20080214 20080215 20080216 20080217 20080218 20080219 20080220 20080222
Completion Status:
100%
GS-2007A-Q-22 Swinbank UK GMOS Integral Field Spectroscopy of E+A Galaxies GMOS-S 10.00 [r08A]
Execution Status: complete / rollover Dates Taken:
20070511 20070512 20070515 20070518 20070519 20070520 20070523 20070607 20070610 20070612 20070618 20070621 20070704
Completion Status:
100%
GS-2007A-Q-23 Telesco US The Mid-IR Structure of Two Debris Disks TReCS 3.50 [r08A]
Execution Status: complete / rollover Dates Taken:
20070428 20070604 20070627 20070701
Completion Status:
100%
GS-2007A-Q-24 Willott CA z=6 quasars to probe the reionization of the universe GMOS-S 6.50 [r08A]
Execution Status: complete / rollover Dates Taken:
20070216 20070512 20070513 20070514 20070519 20070901 20070903 20070904 20070906 20070910 20071103 20071106 20071111 20071112 20071207
Completion Status:
100%
GS-2007A-Q-25 Woodward US Synoptic GNIRS XD Spectra ToO Novae GNIRS 12.00
Execution Status: SToO Dates Taken:
20070308 20070320
Completion Status:
22%
GS Scientific Ranking Band 2
Ref # PI Partner Title Instrument Hours
allocated
GS-2007A-DD-1 Hinkle DD Phoenix NGSC support time 2007A Phoenix 23.00
Execution Status: complete Dates Taken:
20070201 20070301 20071203 20071204 20071205
Completion Status:
100%
GS-2007A-DD-4 Gezari DD Constraining the MIR emssion of SagittariusA* within a coordinated multi-wavelength campaign TReCS 9.00
Execution Status: complete Dates Taken:
20070606 20070607 20070610
Completion Status:
100%
GS-2007A-DD-5 Turner DD The Supergiant Cannibal in Abell 3827 GMOS-S 5.50
Execution Status: complete Dates Taken:
20070527 20070530 20070603 20070606 20070608 20070621 20070707
Completion Status:
100%
GS-2007A-DD-6 Faundez-Abans DD Nuclear activity (?) in FM 47-02, a peculiar Ring Galaxy GMOS-S 1.00
Execution Status: complete Dates Taken:
20070606 20070608
Completion Status:
100%
GS-2007A-DD-7 Radomski DD The Mid-Infrared Mystery of Narrow Line Region AGN TReCS 11.00
Execution Status: Dates Taken:
20070604 20070607 20070628 20070701 20070702 20070703 20070902 20070914
Completion Status:
72%
GS-2007A-DD-8 Lee DD On The First Instance of A Spatial Metallicity Gradient in a Dwarf Irregular Galaxy GMOS-S 4.50
Execution Status: complete Dates Taken:
20070607 20070712 20070716 20070717 20070718 20071106
Completion Status:
100%
GS-2007A-DD-9 Volk DD Mid-Infrared Imaging of Planetary Nebulae TReCS 6.00
Execution Status: complete Dates Taken:
20070703 20070712 20070913 20070926 20071010 20071012 20071014
Completion Status:
100%
GS-2007A-DD-13 Bergmann DD Stellar Populations in Abell 4038: A GMOS-S bright time spectroscopy proposal GMOS-S 5.00
Execution Status: complete Dates Taken:
20070605 20070606 20070607 20070616 20070620 20070621 20070624 20070625 20070630 20070721 20070722 20070723
Completion Status:
100%
GS-2007A-DD-14 Carrasco DD Spectroscopic confirmation of galaxies in SDSS compact groups at z~0.3 GMOS-S 8.60
Execution Status: Dates Taken:
20070610 20070616 20070707 20070711 20070712 20070718 20070721 20070804 20070805 20070807 20070820
Completion Status:
62%
GS-2007A-DD-15 Artigau DD Spectroscopic characterisation of wide binary systems harbouring a cool dwarf GMOS-S 22.14
Execution Status: Dates Taken:
20070617 20070621 20070624 20070705 20070715 20070807 20070808
Completion Status:
36%
GS-2007A-DD-17 Mast DD Kick-off supermassive black hole, first microquasar outside the MW, or the largest radio galaxy at high redshift? GMOS-S 2.00
Execution Status: complete Dates Taken:
20070616 20070617 20070622 20070630 20070710 20070711 20070807
Completion Status:
100%
GS-2007A-Q-26 casassus CL Identifying the nature of the centimetre-wave excess in selected planetary nebulae. TReCS 11.50
Execution Status: complete Dates Taken:
20070629 20070703
Completion Status:
100%
GS-2007A-Q-27 Crowther UK Reconciling the magnetar and cluster distances to SGR1806-20 using GNIRS GNIRS / NIRI 5.50
Execution Status: Dates Taken:
20070408 20070409
Completion Status:
70%
GS-2007A-Q-28 Doyon CA/GS Spectroscopic follow-up of high proper motion brown dwarf candidates GNIRS 44.00
Execution Status: Dates Taken:
20070106 20070107 20070108 20070114 20070116 20070117 20070126 20070129 20070130 20070215 20070219 20070220 20070223 20070224 20070225 20070227 20070310 20070312 20070318 20070319 20070324 20070325 20070329 20070331 20070401 20070402 20070403 20070404 20070406 20070409
Completion Status:
62%
GS-2007A-Q-29 Drissen CA/GS Dynamics and chemical evolution of small starbursts: NGC 5253 GMOS-S 7.50
Execution Status: complete Dates Taken:
20070427 20070511 20070512 20070517 20070518 20070519 20070520 20070521 20070630 20070711
Completion Status:
100%
GS-2007A-Q-30 Firpo AR Giant Extragalactic HII Regions GMOS-S 5.00
Execution Status: complete Dates Taken:
20070323 20070325 20070326 20070427 20070502 20070503 20070511 20070512 20070515 20070606 20070608 20070617 20070618 20070630
Completion Status:
100%
GS-2007A-Q-31 Fisher GS T-ReCS Imaging of IRS8 in the Ne[II] Line Filters TReCS 1.00
Execution Status: complete Dates Taken:
20070429
Completion Status:
100%
GS-2007A-Q-32 Harris CA/GS/US Ages and Metallicities of the Nuclei of Dwarf Elliptical Galaxies GMOS-S 23.00
Execution Status: Dates Taken:
20070218 20070219 20070220 20070221 20070309 20070323 20070325 20070326 20070503 20070514 20070518 20070519
Completion Status:
30%
GS-2007A-Q-33 Jensen US Imaging An Extended Gaseous Disk around a Weak-Lined T Tauri Star TReCS 8.00
Execution Status: complete Dates Taken:
20070525 20070604 20070701 20070702
Completion Status:
100%
GS-2007A-Q-34 Lin CL Unveiling the Nature of the BzK-Selected Galaxies at z>2 GNIRS 37.50
Execution Status: Dates Taken:
20070131
Completion Status:
6%
GS-2007A-Q-35 Lorenz-Martins BR The Nature of Silicate Carbon Stars TReCS 2.50
Execution Status: complete Dates Taken:
20070523 20070818 20071118
Completion Status:
100%
GS-2007A-Q-36 Maraston UK Optical absorption line indices of passive galaxies at redshift 1.5 GNIRS 19.20
Execution Status: Dates Taken:
20070331 20070401 20070402 20070404 20070406
Completion Status:
61%
GS-2007A-Q-37 McMahon UK The reddest objects in the UKIDSS LAS: what are they? GNIRS 10.00
Execution Status: Dates Taken:
20070210 20070215 20070216 20070219 20070325 20070408
Completion Status:
64%
GS-2007A-Q-39 Orton US New Horizons Mission Support: Joint Study of Jupiter's Anticyclonic Vortices and Aurorae TReCS 8.00
Execution Status: complete Dates Taken:
20070209 20070210 20070211 20070212 20070214
Completion Status:
100%
GS-2007A-Q-40 Perlman GS/UK/US High Resolution Mid-IR Imaging of Radio Galaxies TReCS 4.60
Execution Status: complete Dates Taken:
20070210 20070211 20070520 20070629 20070703 20070901 20070907
Completion Status:
100%
GS-2007A-Q-41 Roche UK The dusty circumnuclear material around active galaxy nuclei GNIRS / TReCS 16.00
Execution Status: Dates Taken:
20070130 20070324 20070325 20070326 20070605
Completion Status:
16%
GS-2007A-Q-42 Romanowsky AR/CL/UK/US Dark matter lost or found? - the definitive dynamical portrait of an ordinary elliptical galaxy GMOS-S 11.80
Execution Status: Dates Taken:
20070220 20070225 20070227 20070503 20070512 20070520 20070706 20070712 20070716 20071017 20071212
Completion Status:
70%
GS-2007A-Q-43 Song GS Gemini follow-up of Exo-zodiacal material from Spitzer archive (T-ReCS part) TReCS 15.90
Execution Status: Dates Taken:
20070710 20070715 20070716 20070717
Completion Status:
50%
GS-2007A-Q-44 Teodoro BR Detection of main sequence stars in Westerlund 1 GNIRS 4.20
Execution Status: Dates Taken:
Completion Status:
0%
GS-2007A-Q-45 Wyatt UK Resolving the structure of debris disks around 30-100Myr A stars TReCS 12.30
Execution Status: complete Dates Taken:
20070701 20070702 20070712
Completion Status:
100%
GS-2007A-Q-241 De Buizer GS The Final Piece of the Puzzle: Michelle Follow-Up Observations of a Multi-Wavelength High Mass Protostellar Object Survey Michelle / TReCS 8.30
Execution Status: Dates Taken:
20070321 20070405 20070411 20070701
Completion Status:
41%
GS Scientific Ranking Band 3
Ref # PI Partner Title Instrument Hours
allocated
GS-2007A-Q-46 Bassino AR The faint galaxy content of the Antlia cluster GMOS-S 8.00
Execution Status: SToO Dates Taken:
20070110 20070220 20070322 20070512 20070630 20070706
Completion Status:
10%
GS-2007A-Q-47 Blum US The Incredible Shrinking Milky Way GNIRS 26.00
Execution Status: Dates Taken:
20070408 20070409
Completion Status:
0%
GS-2007A-Q-48 Breton CA Determining the nature of PSR J1744-3922's companion GMOS-S 3.20
Execution Status: Dates Taken:
Completion Status:
0%
GS-2007A-Q-49 Bridges CA Globular Clusters as Probes of Galaxy Formation GMOS-S 6.40
Execution Status: Dates Taken:
20070220 20070512 20070613 20070614 20070706
Completion Status:
11%
GS-2007A-Q-50 Brown US Mid-IR imaging of proto-planetary disks with inner gaps TReCS 12.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2007A-Q-51 Cunha US Chemical Enrichment History of the Bulge: Using IR-Spectroscopy to Probe an Obscured Inner-Bulge Field GNIRS / Phoenix 33.00
Execution Status: Dates Taken:
20070626 20070629
Completion Status:
26%
GS-2007A-Q-52 Dobbie UK Improved constraints on the initial mass-final mass relation GMOS-S 30.00
Execution Status: Dates Taken:
20070215 20070218 20070219 20070220 20070221 20070512 20070517 20070518 20070521
Completion Status:
33%
GS-2007A-Q-53 Drissen CA Infrared Spectroscopy of southern Galactic Wolf-Rayet candidates GNIRS 12.60
Execution Status: Dates Taken:
20070322
Completion Status:
42%
GS-2007A-Q-54 Geballe GS Probing the Circumnuclear and Interstellar Gas in the Ultraluminous IR Galaxy, IRAS 19254-7245 (the Superantennae) GNIRS 14.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2007A-Q-55 Geisler CA/CL The Definitive Age and Metallicity Distributions of Globular Clusters in the Nearest Giant Elliptical Galaxy, NGC 5128 GMOS-S 17.80
Execution Status: complete Dates Taken:
20070117 20070118 20070121 20070215 20070218 20070220 20070328 20070503 20070511 20070512 20070514 20070515 20070517 20070518 20070521 20070525 20070526 20070610 20070712 20070714 20070715
Completion Status:
100%
GS-2007A-Q-56 Hennawi US Quasars Probing Quasars: Shedding Light on the Environments, Emission Geometry and Lifetimes of Quasars GNIRS 20.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2007A-Q-57 Hirst GS The jet triggering mechanism in Compact Steep Spectrum Radio Sources GNIRS 4.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2007A-Q-58 Loubser UK Stellar Population Ages in Nearby Spiral Bulges - Probing the Controversy. GMOS-S 22.50
Execution Status: Dates Taken:
20070220 20070221 20070224 20070225 20070326 20070512 20070513 20070517 20070521 20070522 20070607 20070622 20070710 20070712 20070717 20070718 20070720 20070722
Completion Status:
91%
GS-2007A-Q-59 Luhman US Spectroscopy of Candidate Substellar Companions GNIRS 1.00
Execution Status: Dates Taken:
Completion Status:
0%
GS-2007A-Q-60 Mottram UK Silicate Optical Depth for a Complete Sample of Massive Young Stellar Objects TReCS 11.00
Execution Status: Dates Taken:
20070403 20070429 20070502 20070514 20070519 20070525 20070605 20070606
Completion Status:
45%
GS-2007A-Q-61 Norman GS X-ray selected AGN in a Merging Cluster Environment GMOS-S 4.00
Execution Status: Dates Taken:
20070110
Completion Status:
11%
GS-2007A-Q-62 Quintana CL Studying Cosmic Evolution with the First z>1 X-ray Luminous Galaxy Clusters with SZE Survey Coverage GMOS-S 16.80
Execution Status: Dates Taken:
Completion Status:
0%
GS-2007A-Q-63 Sharples UK The Formation of S0 Galaxies - Gemini South Sample GMOS-S 24.00
Execution Status: Dates Taken:
20070128 20070131 20070219 20070515 20070520 20070521 20070523 20070605 20070612 20070618 20070621 20070717 20070719 20070720
Completion Status:
56%
GS-2007A-Q-64 Soares BR Spectra of Galaxy B and Bridge in the UGC 4703 System GMOS-S 1.00
Execution Status: complete Dates Taken:
20070513 20070515 20070517 20070518
Completion Status:
100%
GS-2007A-Q-65 Volk GS Ground-based Follow-up of the Spitzer LMC survey (SAGE) TReCS 9.90
Execution Status: Dates Taken:
Completion Status:
0%
GS-2007A-Q-66 Wilkes US The Nature of Optically-Faint, X-Ray Selected AGN - Spectroscopy. GNIRS 3.00
Execution Status: complete Dates Taken:
20070130 20070131 20070330 20070402 20070403
Completion Status:
100%
GS-2007A-Q-77 Cidale AR Physical Properties of the Circumstellar Environment of Be Stars GNIRS 2.20
Execution Status: SToO Dates Taken:
Completion Status:
0%
GS-2007A-Q-78 Johnston AU Phase-resolved investigation of the donor star in Cir X-1 GMOS-S 6.10
Execution Status: Dates Taken:
20070130 20070202 20070327 20070521 20070522 20070527 20070529 20070603 20070616 20070620 20070622
Completion Status:
17%
GS-2007A-Q-269 Agueros US Finding the Friends: High-Resolution Spectroscopy of New SDSS Low-Mass White Dwarfs GMOS / GMOS-S 17.30
Execution Status: Dates Taken:
20070524 20070527 20070530 20070612 20070617
Completion Status:
22%
GS-2007A-Q-298 Mottram UK Silicate Optical Depth for a Complete Sample of Massive Young Stellar Objects Michelle / TReCS 9.00
Execution Status: Dates Taken:
20070610
Completion Status:
5%

 

[Science Operations home] [schedules home]


Last updated on: 7 Jun 2021 12:48:00 GMT