 |
Science availability |
|
 |
Individual semester plans (schedules): |
|
|
NORTH: semesters 2002A
| 2002B
| 2003A
| 2003B
| 2004A
| 2004B
|
SOUTH: semesters 2002A
| 2002B
| 2003A
| 2003B
| 2004A
| 2004B
|
|
|
- These schedules show the planned blocks of individual science
instrument and engineering activities. Each instrument has its own
colour code as shown in the schedule legend. Although indicated as
separate events, in some cases the queue, classical, payback and
demonstration science observing and engineering activities may overlap
within a night.
- In some schedule the month names are linked to the nightly execution log pages where
details of the time use can be found. The individual instruments in the
table legend are linked to the specific instrument pages.
- Nightly execution logs and the updated queues for the current semester
are available from the main
schedules page.
|
|
 |
Delivered availability (time use and loss statistics): |
|
|
NORTH: semesters 2002B | 2002A |
SOUTH: semesters 2002B | 2002A |
|
|
- Time loss statistics (due to weather, telescope and instrument
technical problems) are collected on a nightly basis. The
charts show weekly average time loss (histograms) and running averages from the start of the
semester of overall system availability (datapoints, with and without
inclusion of weather loss). [Charts are opened in a new window].
|