CALL FOR PROPOSALS FOR GEMINI OBSERVATORY 2023 LARGE AND LONG PROGRAM TIME |
Important Dates
|
The estimated time available for new Gemini LLPs is provided in the table below. The time available is estimated as 200 hours less any previously allocated LLP time. The numbers in the Table are estimates only, the exact time available will depend on instrument commissioning, engineering, campaign science, limited-term partnerships, etc. as well as the status of ongoing LLP programs.
Site | Band | 2023B | 2024A | 2024B | 2025A | 2025B | 2026A |
North | 1 | 55.0 | 100.0 | 100.0 | 100.0 | 100.0 | 100.0 |
2 | 31.0 | 29.0 | 100.0 | 100.0 | 100.0 | 100.0 | |
South | 1 | 100.0 | 100.0 | 100.0 | 100.0 | 100.0 | 100.0 |
2 | 45.5 | 44.6 | 100.0 | 100.0 | 100.0 | 100.0 |
An individual LLP need not request a balanced program across North/South, RA range, observing conditions, etc. However, the ensemble of approved LLPs must not overly impinge on other observing programs. Therefore, the ensemble of approved LPs should not exceed ~25% of any relevant parameter, such as hemisphere, RA range, and observing condition bins. See this page for further information on observing condition constraints.
LLPs will also be subject to general semester target availability restrictions, as published in the general call for proposals for each semester.
The instruments available for new LLPs are listed below, along with any particular restrictions of note. Successful LLPs may also be limited by the semester-specific instrument availability restrictions announced with each semesters regular Call for Proposals.